Inventory of Jerry built materials in decoration

2022-07-22
  • Detail

The first recruit wall painting steal index: ★★★ phenomenon: latex paint is the most common wall decoration material at present, which can be brushed, roller coated or sprayed in specific construction. If workers are not serious or perfunctory during construction, small color differences often appear. This is especially true of latex paints with darker colors. Experts remind: before using latex paint, you need to add a certain amount of water, and the prepared latex paint should be used up at one time. The paint of the same color should also be painted at one time. If the wall needs to be repaired after construction, the whole wall should be painted again. Second, the index of stolen work in sewer pipeline: ★★ phenomenon: when the construction team is carrying out decoration, sometimes in order to save trouble, it pours a large amount of cement, sand and concrete fragments into the sewer. The direct consequence of this is to seriously block the sewer, causing the kitchen and bathroom to run away due to poor drainage. Although there is no problem in the final acceptance of some projects, there is always the problem of poor drainage. Experts remind: strictly supervise the construction team and do not use sewers as garbage lanes. After the waterway construction is completed, fill all water basins, basins and bathtubs with water, and then waterproof at the same time to see whether the drainage is smooth and whether there is leakage in the pipeline. The third trick is the steal index of wire joints: ★★ phenomenon: electricians do not connect wires according to construction requirements when installing sockets, switches and lamps. Especially when consumers use some water heaters, air conditioners and other electrical appliances with large power consumption, switches and sockets are heated and even burned, which brings great losses to consumers. Experts remind: during the construction, supervise the electrician to carry out the construction in strict accordance with the operating procedures. After the installation of all switches and sockets, be sure to carry out the actual use to see whether there is heating in these parts. The 4th recruit wall and floor tile paving steal index: ★★★ phenomenon: paving wall and floor tiles is a highly technical process. If the workers cut corners, they are most likely to have problems such as hollowing of tiles and uneven joints. In addition, the cement and adhesive used for paving tiles are also exquisite. If the proportion is unreasonable, there will also be problems such as falling off. Experts remind: according to the "quality acceptance standard for family room decoration projects" issued by the Beijing Municipal Construction Commission, the paving of wall and floor tiles is required to be flat and firm, with clear patterns, no dirt and mortar marks, basically the same surface color, uniform joints, no cracks, corners and missing edges, and local hollowing shall not exceed 5% of the total

成都皮肤病医院

贵阳精神医院

天津男科医院

Copyright © 2011 JIN SHI